Project Details
Design and supervision works for the drainage system for Zambezi villas including, sand Traps, Drains, and entrance culvert works at Zankutu trading centre, Lilongwe bypass.
BuildCraft carried out setting out works for the Zambezi Villas entrance culvert in Lilongwe.
The assignment reflects the team's ability to connect survey work, site control, civil works details, and field execution for infrastructure components that must be accurately positioned and safely delivered.